Minor Live Issue #59023
Cancellation policy updation | Tripent Live
Status: | QA Released | Start date: | 02/22/2019 | |
---|---|---|---|---|
Priority: | Normal | Due date: | 02/27/2019 | |
Assignee: | Akhil (TSP) S | % Done: | 100% | |
Category: | Functionality | Estimated time: | 8.00 hours | |
Target version: | - | Spent time: | 20.20 hours | |
DB Changes: | nil | Files Changed: | GTAProvider.cs,
B2B/HotelController.cs Utility.Admin |
|
Keys & Permissions: | nil | Initial Planned Hours: | 0 | |
Areas Affected: | GTA cancellation policy |
Description
Hotel :
The cancellation policy is updating to DB from the first response. that is, the last possible cancellation date is saved based on the first response(search response). Please update it based on the pre-booking response(Availabilty response).
For any kind clarification please get back to me.
History
#1 Updated by Linto V about 6 years ago
- Due date set to 02/22/2019
- Status changed from New to Assigned
- Assignee changed from Ratheesh S to Rijo M J
#2 Updated by Rijo M J about 6 years ago
- Status changed from Assigned to In Progress
#3 Updated by Rijo M J about 6 years ago
- Status changed from In Progress to On hold
- % Done changed from 0 to 20
1.status changed to on hold due to 59018[urgent task]
2.Configuration issue exists in local and result not getting issue exists because of web config key missing
3.Last possible cancellation date is saving from availability response.Issue identified
#4 Updated by Shafas ES about 6 years ago
- Due date changed from 02/22/2019 to 02/23/2019
- Status changed from On hold to Assigned
- Assignee changed from Rijo M J to Binsu M Peter
#5 Updated by Shafas ES about 6 years ago
- Estimated time set to 8.00
#6 Updated by Binsu M Peter about 6 years ago
- Status changed from Assigned to In Progress
#7 Updated by Binsu M Peter about 6 years ago
- Status changed from In Progress to For Review
- Assignee changed from Binsu M Peter to Linto V
- % Done changed from 20 to 100
- DB Changes set to nil
- Keys & Permissions set to nil
- Areas Affected set to GTA cancellation policy
- Files Changed set to GTAProvider.cs, B2B/HotelController.cs
in the case of GTA , cancellation policy from real time check is not assembled to selected hotel session. Therefor the old cancellation policy is saved into roomdetails table. thats why the issue occurs.
#8 Updated by Linto V about 6 years ago
- Status changed from For Review to Fixed not Tested
#9 Updated by Linto V about 6 years ago
- Status changed from Fixed not Tested to QA Released
As per the discussion with Prsob the issue is only for GTA provider.So the fix is only donw to the GTA.Please make sure this issue do not occur for other provider. If any issue with other provider please update bug and inform
#10 Updated by Prasob KP about 6 years ago
In Live this issue occurred for GTA, that doesn't mean the issue is only for GTA.
For all providers please make the cancellation policy to be saved from the pre booking response, which will be the recently updated
LIVE ISSUE SECNARIO:
Hotel was refundable on the first response(Search response ) and the same is updated in our DB (Cancellation date) as the last possible cancellation date.
But it was changed on the next response (Pre booking response/Availability response) and it is not considered. Please consider this latest cancellation date to consider the hotel as refundable/Non-refundable.
#11 Updated by Linto V about 6 years ago
- Status changed from QA Released to Fixed not Tested
#12 Updated by Linto V about 6 years ago
- Status changed from Fixed not Tested to Assigned
- Assignee changed from Linto V to Akhil (TSP) S
#13 Updated by Linto V about 6 years ago
- Due date changed from 02/23/2019 to 02/27/2019
#14 Updated by Akhil (TSP) S about 6 years ago
- Status changed from Assigned to In Progress
Last updated issue fixed.but need more clarification if todate not supplied then it take as non refundable in search response but in prebookresponse it as refundable.As of now it fixed both as non refundable if tocancellation date is not supplied.
#15 Updated by Linto V about 6 years ago
- Initial Planned Hours set to 0
Support for gta cancellatio policy issue(discussion with PM and akhil TSP)
#16 Updated by Akhil (TSP) S about 6 years ago
- Status changed from In Progress to Fixed not Tested
- Files Changed changed from GTAProvider.cs, B2B/HotelController.cs to GTAProvider.cs, B2B/HotelController.cs Utility.Admin
- Issue is little Complicated.
- GTA Issue Fixed. GTA Last cancellation date taking not Correct.Its Fixed in Cancellation and Prebooking responses.
GTAProvider.cs and B2B/HotelController.cs code changed.
#17 Updated by Nithin George about 6 years ago
- Status changed from Fixed not Tested to QA Released